VINRentgenSee the history behind the VIN.
VIN reportupdated 21.10.2026 04:28 UTC

WBS8M9C59H5G84687 BMW M3 2017

VIN WBS8M9C59H5G84687
💥 Minor dents and scratches🧭 231,577 km at auction🔑 Keys available📍 TX - Houston East / Lane - A
Last bid
$14,200
Auction, Oct 15, 2026
Estimated retail value
$30,975
before damage (ACV)
Archive records
2
for this VIN
Auction photos
12
before repair

Page and photos · removal after payment

Last bid · Аукцион
Oct 15, 2026
Last bid
$14 200

Auction photos — before repair

12 photos
Copart · auction photos · Oct 1, 2026
1 / 12

Damage

Primary damage
Minor dents and scratches
Condition
Keys
Yes
Title document
Estimated retail value
$30,975
1FRONT
1Minor dents and scratches

What this means for a buyer

  • • Title reported: Certificate.
  • • Sale result not published. Last bid: $14,200.
  • • Reported pre-damage retail value: $30,975.
  • • The auction reports cosmetic body damage. Check paint thickness and inspect for any repairs beyond the reported damage.
What to inspect
  • ☐paint thickness on doors and fenders
  • ☐panel gaps

VIN auction history

2 records
  1. Oct 15, 2026lot 66334216Last bid $14,200
    Mileage
    231,577 km (143,895 miles)
    Damage
    Minor dents and scratches
    Title document
    Location
    TX - Houston East / Lane - A
    Condition
    Auction preparation permitted, keys available
  2. Oct 1, 2026Copartlot 66334216Last bid $17,000
    2017 BMW M3 VIN WBS8M9C59H5G84687 фото 1
    Mileage
    143,895 miles (231,577 km)
    Damage
    Minor dents and scratches
    Title document
    Location
    TX - Houston East / Lane - A
    Condition
    Auction preparation permitted, keys available

    Saved 12 photos.

Auction mileage history✓ no discrepancies
231,577 km231,577 km

Lot details 66334216

Auction
Auction
Lot number
66334216
Date
Oct 15, 2026
Status
Status not reported
Last bid
$14,200
Estimated retail value
$30,975
Mileage
231,577 km · 143,895 miles · actual
Primary damage
Minor dents and scratches
Condition
Keys
Yes
Title document
Location
TX - Houston East / Lane - A
Buyer country
US
Buyer region
USA, TX
Listing status
Auction ended
First archived
21.10.2026 04:28 UTC
Record updated
21.10.2026 04:28 UTC

Lot details 66334216

Auction
Copart
Lot number
66334216
Date
Oct 1, 2026
Status
Status not reported
Last bid
$17,000
Estimated retail value
$30,975
Mileage
143,895 miles · 231,577 km · actual
Primary damage
Minor dents and scratches
Condition
Keys
Yes
Title document
Location
TX - Houston East / Lane - A
Buyer country
US
Buyer region
USA, TX
Listing status
Auction ended
Listing updated
21.10.2026 04:28 UTC
First archived
13.10.2026 06:38 UTC
Record updated
13.10.2026 06:38 UTC

Price history

DateTypeAmountAuction
Oct 1, 2026Last bid$17,000Copart
data as of Oct 13, 2026Estimated retail value$30,975Copart
Oct 15, 2026Last bid$14,200Auction
data as of Oct 21, 2026Estimated retail value$30,975Auction

Price information may be outdated or inaccurate.

Record source

  • Auction · lot 66334216 · auction Oct 15, 2026
  • Copart · lot 66334216 · auction Oct 1, 2026

Public auction record: auction, lot number and date. A link to the original listing is provided when available.

Specifications BMW M3

VIN
WBS8M9C59H5G84687
Name
BMW M3 2017
Make
BMW
Model
M3
Year
2017
Body style
sedan_4dr
Vehicle type
sedan
Color
Dark gray
Engine
3.0L 6
Displacement
3 L
Cylinders
6
Fuel
Gasoline
Transmission
Automatic
Drivetrain
Rear-wheel drive
Listings
2
First archived
13.10.2026 06:38 UTC
Vehicle record updated
21.10.2026 04:28 UTC

Description

BMW M3 2017, VIN WBS8M9C59H5G84687.

Saved auction history: 2 records, 12 photos.

Record 1: Auction auction, lot 66334216. Auction date: Oct 15, 2026. Location: TX - Houston East / Lane - A. Primary damage: Minor dents and scratches. Mileage: 231,577 km. Title document: CERTIFICATE OF TITLE — ownership certificate. Condition: Auction preparation permitted (ENHANCED VEHICLES). Keys: Yes. Last bid: $14,200.

Record 2: Copart auction, lot 66334216. Auction date: Oct 1, 2026. Location: TX - Houston East / Lane - A. Primary damage: Minor dents and scratches. Mileage: 231,577 km. Title document: CERTIFICATE OF TITLE — ownership certificate. Condition: Auction preparation permitted (ENHANCED VEHICLES). Keys: Yes. Last bid: $17,000.

The auction reports cosmetic body damage. Check paint thickness and inspect for any repairs beyond the reported damage.

Auction records describe the vehicle at the time of listing. They do not replace a physical inspection and diagnostics before purchase.

Questions about this VIN

Where are the photos from?

These are auction listing photos taken before repair. The record identifies the auction, lot number and date.

Why is there no sale price?

The listing includes a last bid, but no confirmed sale price. We show the bid separately.

What does “Minor dents and scratches” damage mean?

The auction reports cosmetic body damage. Check paint thickness and inspect for any repairs beyond the reported damage. at осмотре проверьте: paint thickness on doors and fenders; panel gaps. This is not a repair cost estimate.

Can I remove this VIN from vinrentgen.com?

Removal of VIN WBS8M9C59H5G84687 from vinrentgen.com is paid. The vehicle page and photos are removed after confirmed payment. This does not affect other websites or auction listings.

Similar vehicles in the archive

All BMW M3 in the archive →
WBS53AY0XPFN73835 — 2023 BMW M3, Front end (Front End), before-repair photos
Copart8

BMW M3

2023
VINWBS53AY0XPFN73835
Lot #67473296
17,186 miles3 L · Gasoline
Estimated retail value
$74,539
Last bid
$15,000
WBS23HJ06SFT97817 — 2025 BMW M3, Right side (Right Side), before-repair photos
IAAI8

BMW M3

2025
VINWBS23HJ06SFT97817
Lot #46103501
10,563 miles3 L · Gasoline
Estimated retail value
no data
price not reported
WBS43AY01RFT60951 — 2024 BMW M3, All-over damage (All Over), before-repair photos
IAAI8

BMW M3

2024
VINWBS43AY01RFT60951
Lot #46135196
2 km3 L · Gasoline
Estimated retail value
no data
price not reported
WBS53AY07MFL50633 — 2021 BMW M3, Left front (Left Front), before-repair photos
IAAI8

BMW M3

2021
VINWBS53AY07MFL50633
Lot #46127866
60,983 miles3 L · Gasoline
Estimated retail value
no data
price not reported

We use essential cookies to remember your language, help you return to checkout and save your preferences.

Cookie policy
Essential cookies

Language, security and returning to checkout. These cookies support the service’s core functions.

Website analytics

Analytics is not currently configured.

Analytics off

Cookie policy